undefined
+
  • undefined

Product Name:

Industrial Atomic Putty

Industrial-grade putty boasts excellent heat and temperature resistance, superior spreadability, broad compatibility, easy sanding, and fine texture—ensuring strong adhesion to substrates such as cold-rolled sheets, steel plates, and electrophoretic coatings. This product is ideal for large-area coating applications.


Product details:

Industrial Atomic Putty

Technical specifications

Construction mix ratio: Putty: CHPO hardener = 100 : 2 (by weight)

Workable time after mixing: 6–15 minutes (varies depending on the hardener ratio and temperature changes)

Testing Items

Test Results

Testing standards

Note

Material Status

Light grayish-white, uniformly thickened substance

GB3186-82

 

Viscosity

10–12 cm

GB1749-89

 

Workable Spreading Time

The endpoint is reached when clumping occurs within 6–15 minutes, making it impossible to spread or apply.

GB1727-92

 

Surface drying time

≤50min

GB1728-79

 

Time that can be polished

≥70min

According to GB1728-79, Type C method shall be used.

 

Flexibility

≥50mm

GB1748-79 specifies that the procedure should be carried out

 

Adhesion

3mpa

FB5210-85 specifies the procedure to be followed

 

Impact resistance

≥15 kg·cm

GB1732-93 specifies that it should be carried out

 

Temperature resistance

(-40°C to +120°C)

Three cycles

No powdering, no cracking, and no flaking.

GB1735-79 Paint Film

Heat Resistance Test Method

Environment: T & H 25℃ / 80%

Product Features and Suitable Substrates

  • Suitable substrates: Filling applications for steel plates, iron sheets, and fiberglass surfaces—particularly effective for addressing defects such as wide weld seams and significant substrate depressions found on train bodies, passenger cars, and heavy industrial machinery.
  • Industrial-grade putty offers excellent heat and temperature resistance, superior spreadability, broad compatibility, and is easy to sand for a fine, smooth finish.
  • It exhibits excellent adhesion to substrates such as cold-rolled sheets, steel plates, and electrophoretic coatings.
  • This product is suitable for large-area coating.

Construction Instructions

  1. Sand the substrate ready for puttying, removing oil stains and moisture.
  2. Thoroughly mix the putty with the hardener until the color is evenly consistent.
  3. Quickly level after mixing within the workable time.
  4. After applying and scraping, allow it to harden before sanding.
  5. Thoroughly remove rust flakes, oil stains, old paint films, and moisture from the metal surface using solvents and a polishing tool, ensuring the substrate remains clean and completely dry before coating.
  6. Mix the putty and hardener at a weight ratio of 100:2 until thoroughly combined (ensuring a uniform color). Use the mixture within the available working time of 6 to 15 minutes. If the mixed putty begins to cure—noticeably increasing resistance when you start applying it—immediately stop using it. The usable time can be influenced by ambient temperature, humidity levels, and the amount of hardener added.
  7. Quickly press the mixed putty into the area to be applied, then swiftly smooth it out. As you apply and scrape, firmly pack the putty deeper into the surface—making sure no tiny air bubbles are left behind in the substrate’s imperfection-filled gaps.
  8. If thick coating by scraping is required, apply in layers (2–3 times), allowing each layer to surface-dry for 30 minutes (check by ensuring the surface is no longer sticky to the touch). Each application should not exceed 0.1 cm in thickness.
  9. Grinding can only be performed once the putty has fully hardened. After applying and scraping, wait 60 minutes before sanding with #240 or higher grit sandpaper—dry sanding with a grinder is recommended. During the rainy season or in high-humidity conditions, slightly extend the sanding time to ensure optimal results.

Important Notes

  • Store in a cool, dry place, away from heat and ignition sources, and protect from direct sunlight.
  • If bubbles seep in during application, use a scraper to smooth it out thoroughly, ensuring excellent adhesion.
  • If a thick coat is needed, apply multiple thin layers until the desired thickness is achieved.
  • Unused putty and hardener must be stored tightly sealed; putty mixed with hardener should not be returned to its original container.
  • Storage time: 6 months.

Our strengths

The company boasts a dedicated, in-house R&D team and currently holds multiple invention and utility model patents. In 2012, the company played a key role in drafting the industry standard HG/T 4561-2013, "Unsaturated Polyester Putty." Additionally, in 2021, it contributed to the development of a national standard—GB/T 41953-2022, "Paints and Varnishes—Determination of Moisture Content in Coatings by Gas Chromatography"—as well as the revision of another national standard: GB/T 6739, "Paints and Varnishes—Determination of Film Hardness by Pencil Method." In the coming years, the company plans to actively collaborate with several universities and research institutions through industry-academia partnerships, fostering innovation and co-developing cutting-edge products tailored to meet both customer needs and market demands. At the same time, we will continue strengthening our intellectual property strategy, with an ongoing focus on applying for and securing recognition for advanced technology projects. This includes pursuing certifications such as National High-Tech Enterprise status, Zhaoqing City High-Tech Enterprise designation, Guangdong Provincial Engineering Technology Research Center accreditation, and Zhaoqing City Engineering Technology Research Center certification, among others.

image

Factory Strength

Factory 21

Here is placeholder text.

Here is placeholder text.

Factory 20

Here is placeholder text.

Here is placeholder text.

Factory 19

Here is placeholder text.

Here is placeholder text.

Factory 18

Here is placeholder text.

Here is placeholder text.

Factory 17

Here is placeholder text.

Here is placeholder text.

Factory 16

Here is placeholder text.

Here is placeholder text.

Factory Strength

Factory 21
Factory 20
Factory 19
Factory 18
Factory 17
Factory 16

Exhibition and trade shows

Wuhan Expo 5

Here is placeholder text.

Here is placeholder text.

Wuhan Exhibition 4

Here is placeholder text.

Here is placeholder text.

Wuhan Expo 3

Here is placeholder text.

Here is placeholder text.

Wuhan Exhibition 2

Here is placeholder text.

Here is placeholder text.

Wuhan Exhibition 1

Here is placeholder text.

Here is placeholder text.

Wuhan Exhibition

Here is placeholder text.

Here is placeholder text.

Exhibition and trade shows

Wuhan Expo 5
Wuhan Exhibition 4
Wuhan Expo 3
Wuhan Exhibition 2
Wuhan Exhibition 1
Wuhan Exhibition

Qualifications and Honors

RoHS 2.0 Certificate for Unsaturated Polyester Putty

RoHS 2.0 Certificate for Unsaturated Polyester Putty

Quality System Certificate

Quality System Certificate

Environmental Management System Certificate

Environmental Management System Certificate

Specialized, Specialized, and New Small and Medium-Sized Enterprises

Specialized, Specialized, and New Small and Medium-Sized Enterprises

Guangdong Provincial Engineering Technology Research Center

Guangdong Provincial Engineering Technology Research Center

Qingyuan City Engineering Technology Research and Development Center

Qingyuan City Engineering Technology Research and Development Center

High-Tech Enterprise Certificate 2024

High-Tech Enterprise Certificate 2024

High-Tech Enterprise Certificate 2023

High-Tech Enterprise Certificate 2023

Invention Patent (A Preparation Method for Polyester Resin Suitable for Sprayable Atomic Putty, Atomic Putty Itself, and Its Preparation Method)

Invention Patent (A Preparation Method for Polyester Resin Suitable for Sprayable Atomic Putty, Atomic Putty Itself, and Its Preparation Method)

Invention Patent (A Solvent-Resistant Mud Yellow Eyeshadow and Its Preparation Method – Invention Patent Certificate)

Invention Patent (A Solvent-Resistant Mud Yellow Eyeshadow and Its Preparation Method – Invention Patent Certificate)

A scrape-coated mid-coat automotive coating based on thermoplastic acrylic resin and its preparation method – Invention Patent Certificate

A scrape-coated mid-coat automotive coating based on thermoplastic acrylic resin and its preparation method – Invention Patent Certificate

A High-Speed Rail Atomic Primer and Its Preparation Method – Invention Patent Certificate

A High-Speed Rail Atomic Primer and Its Preparation Method – Invention Patent Certificate

A Dual-Axis Mixing and Dispersion Device for Coating Production – Utility Model Patent Certificate

A Dual-Axis Mixing and Dispersion Device for Coating Production – Utility Model Patent Certificate

A Tail Gas Recovery and Treatment System for a Coating Production Workshop – Utility Model Certificate

A Tail Gas Recovery and Treatment System for a Coating Production Workshop – Utility Model Certificate

A Fully Automatic Water-Based Coating Filling and Weighing System – Utility Model Certificate

A Fully Automatic Water-Based Coating Filling and Weighing System – Utility Model Certificate

A Water-Based Coating Dispersion Vessel with a Dual-Dispersion Stirrer Head – Utility Model Certificate

A Water-Based Coating Dispersion Vessel with a Dual-Dispersion Stirrer Head – Utility Model Certificate

An Eco-Friendly Coating High-Speed Dispersion Device – Utility Model Certificate

An Eco-Friendly Coating High-Speed Dispersion Device – Utility Model Certificate

Utility Model Patent Certificate – A High-Level Coating Tank

Utility Model Patent Certificate – A High-Level Coating Tank

Utility Model Patent Certificate – A Device for Pouring from Iron Drums

Utility Model Patent Certificate – A Device for Pouring from Iron Drums

Utility Model Patent Certificate – A Resin Raw Material Storage Tank

Utility Model Patent Certificate – A Resin Raw Material Storage Tank

Certificate of Honor 2

Certificate of Honor 2

Certificate of Honor 1

Certificate of Honor 1

Certificate of Honor

Certificate of Honor

Product Inquiry


*Note: Please ensure you provide accurate information and keep the communication lines open. We’ll get back to you as soon as possible!